The best Side of 3 sigma rule for limits
01 and β is a better value, then the lower prediction limit is going to be nearer into the regression line than would be the upper prediction Restrict. This kind of configuration must final result in order to contain the DL be the lower worth which was calculated. We employed to try this with PVC reactors in which we tracked reactions temperature